沈先生尺寸有多大,芸能界演艺圈1314芸能,电影《婚前检查》

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 武汉市| 井冈山市| 乌兰浩特市| 玛多县| 栖霞市| 罗江县| 建德市| 齐齐哈尔市| 新平| 徐闻县| 乐亭县| 襄垣县| 青田县| 临猗县| 娱乐| 隆子县| 云南省| 山东省| 元朗区| 巴塘县| 永城市| 皋兰县| 龙游县| 濮阳市| 清涧县| 汶川县| 河北区| 扶余县| 新沂市| 海伦市| 金塔县| 咸宁市| 顺平县| 台南县| 南江县| 南木林县| 利辛县| 南昌市| 密山市| 泰州市| 朝阳市|