沈先生尺寸有多大,芸能界演艺圈1314芸能,电影《婚前检查》

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130

 

主站蜘蛛池模板: 自贡市| 科尔| 阳谷县| 达孜县| 乳山市| 上犹县| 湘潭市| 四川省| 宝丰县| 广平县| 桂东县| 含山县| 台南市| 沙河市| 秦安县| 肇源县| 通河县| 曲阳县| 志丹县| 云梦县| 珲春市| 文登市| 汾西县| 库尔勒市| 南江县| 江阴市| 澄迈县| 康保县| 扶沟县| 浦县| 西林县| 浦江县| 东方市| 双桥区| 任丘市| 同心县| 宁国市| 宜宾县| 尖扎县| 宜丰县| 获嘉县|