沈先生尺寸有多大,芸能界演艺圈1314芸能,电影《婚前检查》

上海金泰工程机械有限公司
上海安亭洛浦路45号 400-820-8326

NEWS

Jintai machine constructed in Egypt

2009-11-10

    The second stage project of Said port Egypt is located in the north of Suez Canal. This project is to make a dock with the square piles in the middle part and T type piles in the circumjacent part. The dock will be the berth for 4 Panama super-type container ships. This project is the key project in Egypt.


 


    We have 7 sets of Jintai machines constructed in Said port as the main force, including 3 sets of SG40A, 1 set of SG35A, 2 sets of SD28W rotary drill and 1 set of SMW ZKD85-3.
The stratum condition: 0-13m sand layer, 13-15m fill-back layer, 15-45m soil layer, 45-57m fine sand layer.


 


    JINTAI machines are praised by the user and Egypt supervisor with good performance.

主站蜘蛛池模板: 铁岭市| 湘潭县| 平泉县| 六枝特区| 濉溪县| 儋州市| 都匀市| 简阳市| 太保市| 新巴尔虎左旗| 大兴区| 南郑县| 竹山县| 黄石市| 林州市| 兖州市| 潞城市| 佛坪县| 宣武区| 江油市| 车险| 安图县| 缙云县| 郧西县| 蓝田县| 涟水县| 桑植县| 武冈市| 丁青县| 竹溪县| 泊头市| 蕉岭县| 南投市| 五寨县| 鞍山市| 五河县| 西峡县| 民县| 湛江市| 龙江县| 满城县|